Tuesday, December 18, 2012

EMP MALAYSIA PROJECT & ENGINEERING DIVISION REQUOTES 3MT/HR AND 5MT/HR SIR 20 PLANT TO INDONESIA

Our Indonesian customer has asked us to requote our prices for 3mt/hr and 5mt/hr SIR rubber processing factories in Indonesia.

They are interested to set up the plant there for their long term investment. We have revised our pricing and submitted to them for evaluation.

Hopefully, we can obtain some positive feedback in 2013.

Interested parties can contact us at : TWKANG@emp.com.my

Wednesday, December 5, 2012

MERRY CHRISTMAS AND A VERY HAPPY NEW YEAR 2013

As 2012 draws to a close in 3 weeks' time, we want to wish everyone of Christian faith "A Very Merry Christmas" and to everyone " A Very Happy New Year 2013 ". Hopefully, 2013 will be a good year in our undertakings, health and happiness.

Enjoy your year end holidays and festivities. Do not drive if you drink and drive carefully.

MERRY CHRISTMAS AND A VERY HAPPY NEW YEAR

Tuesday, December 4, 2012

EMP MALAYSIA QUOTES ELECTRIC HEATING SYSTEM FOR SKIM BLOCK DRYER

Our Projects and Engineering Division has recently quoted our customer for an electrical Heating system for their skim block dryer.

As their factory generates their own electrical power from the waste of Palm oil bunches, they requested us to propose this electrical heating system. They prefer not to have a diesel burner.

Though the request is simple enough, we had some difficulty designing and engineering this electrical system. We have to match the electrical system against the diesel burner performance.

Electrical controls must ensure there is no overheating or underheating, maintaining and to increase or reduce the temperature to the set level, prevention of fire risks and other safety interlocking measures.

In the end, we managed to come up with a suitable system and pricing. We look forward to meeting our client soon and discuss this matter with them.

For enquiries and details: email us at TWKANG@emp.com.my

Search This Blog