Wednesday, October 29, 2014
EMP TURNKEY SKIM BLOCK PROJECT ENTERS DELIVERY STAGE
Within the next 2 weeks, all our skim block wet and dry process will be trucked up Surat Thani, Southern Thailand. Crate measurements have already been measured and inter country trucking company has been engaged. We estimate that 5 nos. of 40 ft containers will be needed to deliver all our goods.
Some finishing works need to be done and the press tested before all the machinery be painted. Sensitive machinery and electrical starter panels will be crated to prevent damage against mishandling and rain.
Tuesday, October 28, 2014
DRYER STRUCTURES AND TROLLIES READY FOR SHIPMENT
The dryer structures are being mounted with stainless steel sheets. The dryer trollies have been completed. Once all items are ready, we will truck all the machinery and equipment to Thailand.
Saturday, October 25, 2014
Thursday, October 23, 2014
EMP PRESS READY TO BE WIRED UP FOR TEST RUN
Our EMP 60tons moving chamber press is to be wired up for testing. After testing, it will be painted before delivery.
Monday, October 20, 2014
SPARE HELICAL GEARBOX ARRIVES
As part of our turnkey project, we are supplying a spare helical gearbox as a spare for their crepers. The client can quickly change the gearbox if any of the creper gearbox malfunction.
Monday, October 13, 2014
TAPPING ACCESSORIES READY FOR SHIPMENT TO AFRICA
Our tapping accessories are ready for shipment to Africa. This order is placed by our long standing African client.
Goods have been packed and will be delivered to our stores for shipment.
Tuesday, October 7, 2014
EMP STATIC CRUSHER COMPLETED
Our initial size reduction crusher has been completed. It will be used to reduce coagulated slabs into 1" thick slabs before they are further processed.
Monday, October 6, 2014
EMP 60 tonnes Moving Chamber Press Being fabricated
Besides the EMP Skim block dryer being constructed, we are also fabricating our 60 tonnes moving chamber press. The press structure is being done including the double chamber.
Thursday, October 2, 2014
DRYER MAIN CIRCULATION FAN DELIVERED FOR DRYER FABRICATION