Thursday, November 13, 2014
LOADING OF LAST CONTAINER COMPLETED
Our last machinery and equipment for our EMP Skim block lone were finally loaded this afternoon.Over a period of 3 days, we loaded our machinery and equipment. Rain damping slightly our loading works but we overcome that. The last machinery that was put into the final container was our EMP 60 tonnes press.
Tuesday, November 11, 2014
LOADING OF EMP SKIM BLOCK SYSTEM HAS BEGUN
We started loading our completed Skim block system yesterday. We had to load some equipment at night. Luckily, with high beam light using my car.
Another two more containers will be loaded today.
Monday, November 10, 2014
ALL GOODS READY TO BE LOADED INTO CONTAINERS
All our goods are ready to be loaded today. 2 x 40ft containers are coming today for loading. Our EMP 60 tons press panel has been shrinked wrap against water and we have also shrinked wrapped the hydraulic package.
CRATING OF ELECTRIC PANELS AND METAL DETECTORS
In our final phase of our turnkey project by packing our sensitive items such electrical panels and the Sartorius metal detector.
In our final phase
Friday, November 7, 2014
EMP 60TONS MOVING CHAMBER PRESS TESTED AND READY FOR DELIVERY
Tested EMP 60 tons press is ready for delivery.
All safety guards are painted bright yellow so that users are aware of danger zones. The guards are mounted to prevent accidents from occurring.
Tuesday, November 4, 2014
TESTING EMP PRESS BEFORE DELIVERY
All our machinery are factory tested before delivery. Photo shows our press being wired up before testing the controls and operation.
Saturday, November 1, 2014
EMP MOVING CHAMBER PRESS WIRED UP FOR TESTING
Our EMP Press has been wired up before testing next week. Powered by German made dual pump and auxillary hydraulic items, our press is reliable and robust.