Wednesday, November 26, 2014

SITE INSTALLATION STAGE OF TURNKEY PROJECT IN THAILAND

Our turnkey Skim Block rubber processing system is now at the site installation stage. All the machinery and equipment were safely delivered to factory site on 22nd. November 2014. Our Managing Director, flew in and visited the factory to inspect the machinery and equipment. All the equipment were checked and verified by the owners as well. By shipping out the machinery and equipment in 5nos. x 40ft. containers proved invaluable as all items were delivered intact and no pilferage were discovered.

Our project is in the site installation stage. Thai contractors and some minor material will be bought to complete the installation of the dryer. With our

Monday, November 24, 2014

INSPECTION OF MACHINERY AT FACTORY AND MACHINERY LAYOUT

EMP Final Shredder on frame with Stainless Steel Trough at the bottom.
Battery of EMP Crepers in line formation
EMP Dryer being installed.

Saturday, November 22, 2014

OUR 5 X 40FT. CONTAINERS ARRIVED AT THAI FACTORY YESTERDAY

Our EMP Skim Block Rubber processing system shipped out in 5 x 40ft. containers has arrived at our customer's factory yesterday after clearing Thai Customs on 21st.November 2014.

Mr. Kang, our Managing Director will be flying into Southern Thailand tomorrow to oversee the machinery layout at site and start off the installation of mechanical and electrical works by our Thai contractors. Some items will be purchased in Thailand for the insulation of the dryer at site.

We hope to complete the installation works by mid December 2014 so that the final inspection and energising of the line can be done.

Thursday, November 13, 2014

LOADING OF LAST CONTAINER COMPLETED

Our last machinery and equipment for our EMP Skim block lone were finally loaded this afternoon.Over a period of 3 days, we loaded our machinery and equipment. Rain damping slightly our loading works but we overcome that. The last machinery that was put into the final container was our EMP 60 tonnes press.

Tuesday, November 11, 2014

LOADING OF EMP SKIM BLOCK SYSTEM HAS BEGUN

We started loading our completed Skim block system yesterday. We had to load some equipment at night. Luckily, with high beam light using my car. Another two more containers will be loaded today.

Monday, November 10, 2014

ALL GOODS READY TO BE LOADED INTO CONTAINERS

All our goods are ready to be loaded today. 2 x 40ft containers are coming today for loading. Our EMP 60 tons press panel has been shrinked wrap against water and we have also shrinked wrapped the hydraulic package.

CRATING OF ELECTRIC PANELS AND METAL DETECTORS

In our final phase of our turnkey project by packing our sensitive items such electrical panels and the Sartorius metal detector. In our final phase

Friday, November 7, 2014

EMP 60TONS MOVING CHAMBER PRESS TESTED AND READY FOR DELIVERY

Tested EMP 60 tons press is ready for delivery. All safety guards are painted bright yellow so that users are aware of danger zones. The guards are mounted to prevent accidents from occurring.

Tuesday, November 4, 2014

TESTING EMP PRESS BEFORE DELIVERY

All our machinery are factory tested before delivery. Photo shows our press being wired up before testing the controls and operation.

Saturday, November 1, 2014

EMP MOVING CHAMBER PRESS WIRED UP FOR TESTING

Our EMP Press has been wired up before testing next week. Powered by German made dual pump and auxillary hydraulic items, our press is reliable and robust.