Thursday, December 18, 2014

EMP INSTALLATION TEAM AT SITE IN S. THAILAND

3 comments:

  1. After 4 days of installation by our team, our EMP Skim block dryer is fast taking its form. Insulation panels have been installed and the rail return track is being aligned.

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. Electrical wiring from dryer control panel to all motors to be done las test by next week.

    ReplyDelete