Monday, October 26, 2015

POST INSTALLATION INSPECTION

Our managing director is flying to Surat Thani to do a post installation inspection on our EMP Skim block processing line. Need to tie up some loose ends and to check performance of the wet and dry lines.
He will return on Saturday.

No comments:

Post a Comment

Search This Blog