Monday, October 26, 2015
POST INSTALLATION INSPECTION
Our managing director is flying to Surat Thani to do a post installation inspection on our EMP Skim block processing line. Need to tie up some loose ends and to check performance of the wet and dry lines.
He will return on Saturday.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Search This Blog
No comments:
Post a Comment