Saturday, December 27, 2014
Thursday, December 18, 2014
MR KANG LEAVING SURAT TO THUNG SONG TODAY
Tuesday, December 16, 2014
Wednesday, November 26, 2014
SITE INSTALLATION STAGE OF TURNKEY PROJECT IN THAILAND
Our project is in the site installation stage. Thai contractors and some minor material will be bought to complete the installation of the dryer. With our
Monday, November 24, 2014
INSPECTION OF MACHINERY AT FACTORY AND MACHINERY LAYOUT
Saturday, November 22, 2014
OUR 5 X 40FT. CONTAINERS ARRIVED AT THAI FACTORY YESTERDAY
Mr. Kang, our Managing Director will be flying into Southern Thailand tomorrow to oversee the machinery layout at site and start off the installation of mechanical and electrical works by our Thai contractors. Some items will be purchased in Thailand for the insulation of the dryer at site.
We hope to complete the installation works by mid December 2014 so that the final inspection and energising of the line can be done.
Thursday, November 13, 2014
LOADING OF LAST CONTAINER COMPLETED
Tuesday, November 11, 2014
LOADING OF EMP SKIM BLOCK SYSTEM HAS BEGUN
Monday, November 10, 2014
ALL GOODS READY TO BE LOADED INTO CONTAINERS
CRATING OF ELECTRIC PANELS AND METAL DETECTORS
Friday, November 7, 2014
EMP 60TONS MOVING CHAMBER PRESS TESTED AND READY FOR DELIVERY
Tuesday, November 4, 2014
TESTING EMP PRESS BEFORE DELIVERY
Saturday, November 1, 2014
EMP MOVING CHAMBER PRESS WIRED UP FOR TESTING
Wednesday, October 29, 2014
EMP TURNKEY SKIM BLOCK PROJECT ENTERS DELIVERY STAGE
Tuesday, October 28, 2014
DRYER STRUCTURES AND TROLLIES READY FOR SHIPMENT
Saturday, October 25, 2014
Thursday, October 23, 2014
EMP PRESS READY TO BE WIRED UP FOR TEST RUN
Monday, October 20, 2014
SPARE HELICAL GEARBOX ARRIVES
Monday, October 13, 2014
TAPPING ACCESSORIES READY FOR SHIPMENT TO AFRICA
Goods have been packed and will be delivered to our stores for shipment.
Tuesday, October 7, 2014
EMP STATIC CRUSHER COMPLETED
Monday, October 6, 2014
EMP 60 tonnes Moving Chamber Press Being fabricated
Thursday, October 2, 2014
DRYER MAIN CIRCULATION FAN DELIVERED FOR DRYER FABRICATION
Wednesday, October 1, 2014
Wednesday, September 24, 2014
EMP STATIC CRUSHER TAKING SHAPE
Our EMP Static Crusher for reducing skim blocks into slabs of 1" thickness is fast being fabricated. Our manufacturer only needs to install the gearboxes and the motor. The prime mover will be used to power the two rollers.
Once all the components are installed, the crusher will be ready to be delivered to our Thai client.
Crushers can be used to reduce large rubber slabs into thinner slabs and dewater the rubber. They can be used as the primary pre-size reduction machine such as crushing embedded stones in the rubber slab and take out unwanted water as well.
If interested, please email us at TWKANG@emp.com.my
Tuesday, September 23, 2014
EMP TRADING DIVISION SECURES TAPPING ACCESSORIES ORDER
Our company will be expediting the order from our long term client in Africa. This plantation group has been our customer for the past 20 years and we value their continuous support in ordering our products.
Plantation companies interested in our products can always email us at TWKANG@emp.com.my
EMP Skim Block Wet Process Line Electrical Panel being manufactured
Once tested, the panel will be wrapped in plastic and crated before delivery.
Monday, September 8, 2014
Sunday, August 31, 2014
EMP WET SKIM BLOCK LINE
Preparing our EMP Wet line processing system for end September delivery. Colour code for the machinery has been approved by the buyer who came in on 30.8.2014 to inspect the machinery.
We will be painting the completed machinery with the agreed colour codes before itemising them for partial delivery of the wet process line.
All our machinery and auxilliary items are pre-marked at the factory site before delivery. Mechanical installation is simplified and no civil works such as foundations are required. The crusher, crepers, belt conveyors and shredder are designed for easy installation and alignment. Only a flat concrete factory floor is required. Mechanical installation at site can be done within a day or two - thus saving time.