Monday, June 29, 2015

LOADING OF WET RUBBER CRUMBS INTO DRYER TROLLEYS


A horizontal moving loading hopper was added to our static screen for loading wet rubber crumbs from the crumb transfer pump into the dryer trolleys. By doing so, only one person is used to load the crumbs into the trolleys.

Our complete EMP Skim Block rubber processing line is now in full operation. Our complete EMP Wet processing line is functioning well and our dry line i.e. the hybrid dryer, automatic rubber baling press and Metal detector are also in operation.

Our managing director, Mr. Kang will be flying into Surat Thani next week for a final installation inspection.

1 comment:

  1. I am continually amazed by the amount of information available on this subject. What you presented was well researched and well worded in order to get your stand on this across to all your readers.
    Vectra

    ReplyDelete

Search This Blog